RSA#1 U.S. Cellular - 62' Tall Monopine Cellular tower

2 Documents in Project

Summary

SCH Number
2010082071
Lead Agency
Humboldt County
Document Title
RSA#1 U.S. Cellular - 62' Tall Monopine Cellular tower
Document Type
NOD - Notice of Determination
Received

Document Description
Conditional Use Permit for the development of a 62' tall cellular communications facility in the R-1 zone. A Special Permit is also requested to allow the proposed tower to exceed the 35' height limit. The "mono-pine"-style pole, proposed equipment shelter (approximately 180 sf in size), and concrete pads for a future diesel back-up generator and propane tank, will be located along the south-western boundary of the approximately 2-acre parcel. The proposed pole will utilize a "stealth" design that is manufactured to look like a conifer tree. The tower is designed to allow room for co-location by another carrier. All antennas will be hidden within the "branches" of the "monopine". The applicant has submitted evidence indicating that the antennas currently proposed will not exceed the FCC's standards for public exposure.

Contact Information
Steve Lazar
Humboldt County Community Development Services
Planning Division 3015 H Street
Eureka, CA 95501

707-268-3741

Location

Coordinates
45.09°6.36'4.8"N 40.3°6.63'9.4"W
Cities
Eureka
Counties
Humboldt
Cross Streets
Beechwood Drive and Ridgewood Drive
Zip
95501
Total Acres
2
Parcel #
303-022-38
State Highways
Hwy 101
Railways
Northwestern Pacific
Airports
Murray Field
Schools
Ridgewood ES
Waterways
Ryan Creek
Township
4N
Range
1W
Section
14
Base
HBM

Notice of Determination

Approving Agency
County of Humboldt
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Planning Division 3015 H Street Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search