Mulqueeney Ranch Wind Repowering Project

21 Documents in Project

Summary

SCH Number
2010082063
Lead Agency
Alameda County
Document Title
Mulqueeney Ranch Wind Repowering Project
Document Type
NOP - Notice of Preparation
Received

Document Description
Notice is hereby given that the County of Alameda (County) will be the Lead Agency and will prepare a Subsequent Environmental Impact Report (SEIR) for the Mulqueeney Ranch Wind Repowering Project (Project) pursuant to the California Environmental Quality Act (CEQA, 1970, as amended). The Project is an application for a Conditional Use Permit (CUP) to repower (i.e., redevelop) an estimated 518 previously existing wind energy turbine sites with up to 36 new turbines with nameplate production capacity rated between 2.2 and 4.2 megawatts (MW) each, that together will have a maximum production capacity of approximately 80 MW. Although the Project objective of 80 MW s of capacity could be nearly met with as few as 19 turbines with a rating of 4.2 MW each, or met with fewer turbines of different combinations of capacity ratings, the SEIR will evaluate up to 36 turbine sites in order to assess a worst-case condition of ground disturbance, visual effects, avian mortality, total rotor swept area and other potential impacts of 36 turbine sites, and a maximum Project capacity of 80 MW. Due to commercial considerations (e.g., turbine availability, financial decisions, etc.), final siting, _wind resource conditions and other site constraints, the applicant may reduce the number of turbine sites; however, the Project goal remains 80 MW of production, which will be the basis for the SEIR analysis. Micro-siting studies will also be conducted in parallel with preparation of the SEIR to assist in final siting decisions. See NOP for full details.

Contact Information
Andrew Young
Alameda County Community Development Agency
224 W. Winton Avenue, Suite 110
Hayward, CA 94544

Phone : (510) 670-5400
andrew.young@acgov.org

Location

Counties
Alameda
Cross Streets
Patterson Pass Road, Tesla Road
Total Acres
4,589
Parcel #
See NOP
State Highways
Interstate 580

Notice of Completion

Review Period Start
Review Period End
Development Type
Power:Wind (between 2.2 and 4.2 MW, up to 80 MW)
Project Issues
Biological Resources Cumulative Effects
Reviewing Agencies
California Air Resources Board California Department of Conservation California Department of Forestry and Fire Protection California Department of Parks and Recreation California Department of Transportation, District 4 California Department of Transportation, Division of Aeronautics California Department of Water Resources California Energy Commission California Governor's Office of Emergency Services California Highway Patrol California Natural Resources Agency California Public Utilities Commission California Regional Water Quality Control Board, San Francisco Bay Region 2 Department of Toxic Substances Control Office of Historic Preservation State Water Resources Control Board, Division of Drinking Water California Native American Heritage Commission California Department of Fish and Wildlife, Bay Delta Region 3

Attachments

Environmental Document
NOP   PDF 6423 K
State Comments
2010082063_CDFW Comment   PDF 345 K 2010082063_NAHC Comment   PDF 453 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.