Mulqueeney Ranch Wind Repowering Project
34 Documents in Project
Summary
SCH Number
2010082063
Lead Agency
Alameda County
Document Title
Mulqueeney Ranch Wind Repowering Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
Notice is hereby given that the County of Alameda (County) will be the Lead Agency and will prepare a Subsequent Environmental Impact Report (SEIR) for the Mulqueeney Ranch Wind Repowering Project (Project) pursuant to the California Environmental Quality Act (CEQA, 1970, as amended). The Project is an application for a Conditional Use Permit (CUP) to repower (i.e., redevelop) an estimated 518 previously existing wind energy turbine sites with up to 36 new turbines with nameplate production capacity rated between 2.2 and 4.2 megawatts (MW) each, that together will have a maximum production capacity of approximately 80 MW. Although the Project objective of 80 MW s of capacity could be nearly met with as few as 19 turbines with a rating of 4.2 MW each, or met with fewer turbines of different combinations of capacity ratings, the SEIR will evaluate up to 36 turbine sites in order to assess a worst-case condition of ground disturbance, visual effects, avian mortality, total rotor swept area and other potential impacts of 36 turbine sites, and a maximum Project capacity of 80 MW. Due to commercial considerations (e.g., turbine availability, financial decisions, etc.), final siting, _wind resource conditions and other site constraints, the applicant may reduce the number of turbine sites; however, the Project goal remains 80 MW of production, which will be the basis for the SEIR analysis. Micro-siting studies will also be conducted in parallel with preparation of the SEIR to assist in final siting decisions.
See NOP for full details.
Contact Information
Name
Andrew Young
Agency Name
Alameda County Community Development Agency
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Alameda
Cross Streets
Patterson Pass Road, Tesla Road
Total Acres
4,589
Parcel #
See NOP
State Highways
Interstate 580
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
Development Types
Power:Wind (between 2.2 and 4.2 MW, up to 80 MW)
Project Issues
Biological Resources, Cumulative Effects
Attachments
Environmental Document
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.