Summit Wind Repower Project (Lake or Streambed Alteration Agreement No. 1600-2016-0337-R3)
34 Documents in Project
Summary
SCH Number
2010082063
Lead Agency
Alameda County
Document Title
Summit Wind Repower Project (Lake or Streambed Alteration Agreement No. 1600-2016-0337-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2017
Present Land Use
Large Parcel Agriculture and Agriculture
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0336-R3, pursuant to section 1602 of the Fish and Game Code to the Project applicant, Jiddu Tapia/Altamont Winds, LLC.
This proposed project involves installation of up to 26 new more efficient wind turbine generators (WTG), improvements to related infrastructure and roads within an existing decommissioned wind site, and removal of existing below grade turbine foundations that obstruct placement of project facilities. The project includes building new access roads, widening existing roads, constructing new laydown yards, installing underground electrical collector lines, installing culverts on stream crossings, conducting horizontal directional drilling, installing meteorological towers, and improving related infrastructure.
Project site is within an existing decommissioned wind site. Prior decommissioning activities conducted at the site included cut back and burial existing WTH foundations. However, foundations were not fully excavated and removed. Therefore, the project will include removal of existing below grade WTG foundations on an as-needed basis; only those that obstruct placement of project facilities.
Contact Information
Name
Marcia Grefsrud
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Livermore, Tracy
Counties
Alameda
Regions
Unincorporated
Cross Streets
North and south of I-580 just west of the Alameda/Contra Costa County border
Total Acres
43.358
State Highways
I-580
Airports
Byron
Schools
Mountain House ES; San Joaquin Delta College
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.