San Francisco Bay Trail: Pinole Shores to Bayfront Park

6 Documents in Project

Summary

SCH Number
2010082043
Lead Agency
East Bay Regional Parks District
Document Title
San Francisco Bay Trail: Pinole Shores to Bayfront Park
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2015
Present Land Use
San Pablo Bay Conservation Area/Open Space (OS)
Document Description
The proposed project is the extension of an existing Class I non-motorized, paved trail from a hillside bluff across from Hazel Lane in Pinole Shores east over the Union Pacific Railroad (UPRR) tracks to connect to an existing path in Bayfront Park. The alignment travels between the UPRR and Burlington Northern Santa Fe Railroad tracks for approximately 1,500 ft, then sweeps north and east on a 140-ft radius curve with a bridge of approximately 1,100-ft in length to cross over the UPRR tracks. The last segment of the trail parallels the UPRR tracks, traversing wetlands and marsh lands of San Pablo Bay, to connect with the existing path in Bayfront Park.

Contact Information

Name
Sean Dougan
Agency Name
State Coastal Conservancy
Contact Types
Lead/Public Agency

Location

Cities
Pinole
Counties
Contra Costa
Cross Streets
Hazel Lane, Tennent Avenue
Zip
94564
Railways
UPRR, BNSF
Waterways
San Pablo Bay

Notice of Determination

Approving Agency
State Coastal Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print