The proposed activities include retrofitting an exiting gabion wall by building a new concrete retaining wall in front of the toe of the gabion wall and restraining the new wall with grouted tie back anchors. Rock slope protection will be added on the slope upstream and downstream of the gabion wall. Rock will also be placed to create weirs within the channel of Marshall Creek. Installation of geotextile fabric will be placed on the slope prior to placement of the rock. The rock will then be backfilled with native streambed material and re-vegetated. Two four-inch storm drain lines will collect runoff from the roof downspouts and convey flow to protected pipe outlets at the upstream and downstream ends of the bank stabilization measures. Marshall Creek will be dewatered and diverted around the project site. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2010-0296-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Arthur Cody.
Contact Information
Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
Santa Cruz
Cross Streets
Hubbard Gulch and Highway 9
Zip
95005
Total Acres
4
Parcel #
078-101-03
State Highways
Hwy 9
Waterways
Marshall Creek
Other Location Info
City/Nearest Community: Ben Lomond
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A