Cody, 09-0131
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010082017
- Lead Agency
- Santa Cruz County
- Document Title
- Cody, 09-0131
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/20/2010
- Document Description
- Proposal to construct a 25 foot long diversion wall and a 42 foot 6 inch long reinforcement retaining wall in front of the existing gabion basket, install rock slope protection within the Riparian Corridor of Marshall Creek and remove 576 sq ft of unpermitted deck and 601 square feet of unpermitted room addition at dwelling. Project also includes recognize conversion of 1,068 square feet of lower floor of dwelling to habitable space and conversion of a detached structure from habitable space back to storage space. Requires a Riparian Exception, a Geological/Soils Report Review, Biotic Assessment and Environmental Review. Property located on the south side of Hubbard Gulch Road (435 Hubbard Gulch Road) about .75 miles west of the intersection with Hwy 9.
- Contact Information
-
Matthew Johnston
Santa Cruz County Planning Department
701 Ocean Street, 4th floor
Santa Cruz, CA 95060
Phone : (831) 454-3201
Location
- Counties
- Santa Cruz
- Cross Streets
- Hubbard Gulch and Highway 9
- Zip
- 95005
- Total Acres
- 4
- Parcel #
- 078-101-03
- State Highways
- Hwy 9
- Waterways
- Marshall Creek
- Other Location Info
- City/Nearest Community: Ben Lomond
Notice of Determination
- Approving Agency
- Santa Cruz County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- www.sccounty01.co.santa-cruz.ca.us/planning/plnmeetings/ASP/Display/ASPX/DisplayMinutes.aspx?MeetingDate=8/5/2010&MeetingTye=7
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.