Palermo-East Nicolaus 115-kV Transmission Line Reconstruction Project
10 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010082014
- Lead Agency
- California Public Utilities Commission (CPUC)
- Document Title
- Palermo-East Nicolaus 115-kV Transmission Line Reconstruction Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/12/2011
- Present Land Use
- Various
- Document Description
- The project would include the reconductoring of both spans of the double circuit transmission line with approximately 45 miles of new conductor. To accommodate reconductoring, replacement of the existing lattice steel towers will be required. Towers will be replaced with a combination of hybrid tubular steel poles, and lattice poles. Construction time: 12-18 months.
- Contact Information
-
Curtis L Fossum
CA State Lands Commission
Lead/Public Agency
100 Howe Avenue, Suite 100-S
Sacramento, CA 95825-8202
Phone : (916) 574-1800
Location
- Coordinates
- 39°9'54"N 121°33'35.5"W
- Cities
- Marysville Oroville Yuba City
- Counties
- Butte Sutter Yuba
- Cross Streets
- several
- Zip
- 95901
- Total Acres
- 45 miles-a route
- State Highways
- SR 20,65,70
- Railways
- SPRR, UPRR
- Airports
- Yuba County, Siller Bros Inc. -
- Schools
- several
- Waterways
- several
- Other Location Info
- City: Nicolaus
- Other Information
- Airports cont. Aviation (a private airstrip)
Notice of Determination
- Approving Agency
- CA State Lands Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.