Stream Alteration Agreement No. 2010-0175-R4 for the Buena Vista 8 Water Project Turnout
8 Documents in Project
Summary
SCH Number
2010081076
Lead Agency
Buena Vista Water Storage District
Document Title
Stream Alteration Agreement No. 2010-0175-R4 for the Buena Vista 8 Water Project Turnout
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2011
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the BV8 State Water Project Turnout. The Project will consist of the construction of a new water turnout on the CA Aqueduct to deliver water into BVWSD's West Side Canal via a new underground pipeline and discharge structure. The turnout structure will be constructed on the east bank of the Aqueduct consisting of a concrete structure, 78-inch by 78-inch sluice gate, electronic actuator, trash screens, pedestrian walk and rails, and appurtenances along with a meter vault, instrument building, and air vents within the Department of Water Resources right-of-way. The underground pipeline connecting the turnout to the discharge facility on the West Side Canal will be approximately 1510 feet long, 78-inches diameter, and of reinforced concrete pipe. The temporary trench will have a maximum depth of approximately 13 feet deep with a maximum trench width of approximately 30 feet. It will be necessary for the pipeline and trench to traverse the Kern River Flood Channel in order to deliver water into the West Side Canal.
Contact Information
Name
Annette Tenneboe
Agency Name
CDFG
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Kern
Zip
93206
Parcel #
159-140-09, 159-130-03
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
California Aqueduct, Kern River Flood Channel, West Side Canal, Short Main Canal, Arizona Canal,
Township
30S
Range
24E
Section
9
Base
MDB&M
Other Location Info
City/Nearest Community: Buttonwillow
Other Information
Waterways Continued: Florida Drain, Freeborn Ditch, Main Drain, Section 3-4 Drain.
Notice of Determination
Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes