CA State University San Marcos, University Student Union, Schematic Plan Approval

3 Documents in Project

Summary

SCH Number
2010081047
Lead Agency
California State University, San Marcos (CSUSM)
Document Title
CA State University San Marcos, University Student Union, Schematic Plan Approval
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2011
Present Land Use
Designated as Student Union on the 1988 Campus Master Plan
Document Description
This project will construct a 78,757 GSF facility that will provide a large ballroom, meeting rooms, Associated Student and student organization offices, food services, lounges, a coffee shop, and recreational areas. The University Student Union will be four levels conforming to the natural slope declination from the top Forum Plaza level down to Cesar Chavez Circle. The design utilizes a steel braced frame that wraps around an interior courtyard with a presentation stage and terraced seating. Much of the building exterior facade is a composition of large-scale, stone-like textured ceramic tile and floor to ceiling glass curtain wall. The building will provide access at multiple levels and enable unrestricted access for the disabled. Sustainable features include extensive use of day lighting, high performance glazing, and photovoltaics on a significant portion of the flat roof areas. Other features include high efficiency HVAC systems, automated controls for lighting and HVAC for areas with operable windows, and green roofs to reduce heat island effect. The project will seek LEED Gold certification.

Contact Information

Name
Bradly Fenton
Agency Name
The Trustees California State University
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
South Twin Oaks Valley Road and Barham Drive
Zip
92026
Total Acres
2
Parcel #
221-670-02-00/221-670-03-00
State Highways
SR-78
Railways
SPRINTER
Schools
San Marcos
Waterways
San Marcos Creek

Notice of Determination

Approving Agency
The Trustees of the CA State University
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print