Lake or Streambed Alteration Agreement No. R1-08-0564 for Timber Harvesting Plan (THP) 1-08-160MEN; "Shorter Cut THP"

Summary

SCH Number
2010079008
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. R1-08-0564 for Timber Harvesting Plan (THP) 1-08-160MEN; "Shorter Cut THP"
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2010
Document Description
DFG is issuing an agreement for 8 encroachments: a) Map Point 2, modify an existing 24 inch culvert crossing on a Class II watercourse by removing a downspout, armoring the inlet and outlet with rock and armoring the outlet side of the fill with rock, b) Map Point 7, replace an existing 12 inch culvert with a 24 inch culvert, armoring the inlet and outlet with rock, and installing a critical dip, c) Map Point 8, bevel inlet of existing 48 inch culvert, armoring the outlet with rock and installing a critical dip, d) Map Point C, replace a damaged 24 inch culvert with a 36 inch culvert, armoring the inlet and outlet with rock, installing a critical dip and removing perched fill, e) Map Point W14, water drafting from a Class I watercourse (Elk Creek), f) Map Point W15, water drafting via gravity flow from a Class II watercourse to a storage tank, g) Map Point W16, water drafting via gravity flow from a Class II watercourse to a storage tank and h) Map Point W17, water drafting via gravity flow from a Class II watercourse to a storage tank.

Contact Information

Name
Richard Macedo
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Mendocino

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print