Miller Timber Harvesting Plan

Summary

SCH Number
2010079003
Lead Agency
Forestry and Fire Protection, Department of (Cal Fire)
Document Title
Miller Timber Harvesting Plan
Document Type
NOD - Notice of Determination
Received

Document Description
The project is limited to: the removal of a failed 18" diameter corrugated metal pipe (CMP) and replacement with a permanent 36" diameter CMP Class III watercourse; the removal of a failed 18" diameter CMP and replaced with a permanent rocked ford on a Class III watercourse; the installation of a temporary Spittler-type crossing on a Class II watercourse; the removal of an under-sized 36" diameter CMP and replacement with a low-water ford on a Class I watercourse; and the enlargement of an existing waterhole.

Contact Information
David Richter
Department of Fish and Game
North and Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

530-695-3199

Location

Counties
Plumas
Other Location Info
Humbug Creek

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Cal Fire 6105 Airport Rd Redding, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search