Temporary Waterline for Phase 2A Base Liner at Salton City Landfill

6 Documents in Project

Summary

SCH Number
2010071072
Lead Agency
Imperial County
Document Title
Temporary Waterline for Phase 2A Base Liner at Salton City Landfill
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2021
Document Description
A temporary waterline is necessary to provide construction water to a project at the Salton City Landfill. The temporary waterline would be placed aboveground along the southern edge of the paved traveled portion of the landfill access road as it crosses Section 6, T11S, R10E. The waterline would cross Poleline Road in Section 7, T11S, R10E within State Parks land south of the intersection property underground through an existing storm water drainage culvert. Issuance of a temporary access permit from State Parks would allow the construction of the waterline on Parks-owned property.

Contact Information

Name
Sara Lockett
Agency Name
California State Parks
Contact Types
Responsible Agency

Location

Counties
Imperial
Other Information
Salton City Landfill

Notice of Determination

Approving Agency
Department of Parks and Recreation
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
The administrative record for this project can be obtained through the County Clerk located at 940 W. Main Street, Suite 202, El Centro, CA 92243. Additionally, State Parks' administrative record can be obtained at 5172 Highway 78, Borrego Springs, CA 92004.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print