Owens Dry Lake Phase 8 Dust Control Measurement Project

4 Documents in Project

Summary

SCH Number
2010071044
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Owens Dry Lake Phase 8 Dust Control Measurement Project
Document Type
NOD - Notice of Determination
Received

Document Description
As a means of controlling excessive dust emissions, the Los Angeles Department of Water and Power proposes to install and maintain ~2.03 sq. miles of gravel cover at the northern end of the Owens Dry Lakebed that the Great Basin Unified Air Pollution Control District has identified as emissive. In addition to the actual installation of gravel, the project includes placement of up to 6,000 tons of road base material to expand the roadway known as Corridor 1, construction of berms, placement of permeable geotextile fabric, stockpiling of gravel during project construction, an d hauling of gravel from the source areas to the construction area by truck along the Main Line Road.

Contact Information
Curtis L. Fossum
California State Lands Commission
100 Howe Avenue, Suite 100 S
Sacramento, CA 95825-8202

(916) 574-1800
(916) 574-1810

Location

Coordinates
36°31'24"N 118°0'33"W
Counties
Inyo
Cross Streets
Sulfate Road, Main Line Road
Zip
93530
Total Acres
1300
Parcel #
026-180-09
State Highways
U.S. 395, SR 136 and etc.
Waterways
Owens River
Base
MDB&M
Other Location Info
City/Nearest Community: Lone Pine, Keeler

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
California State Lands Commission 100 Howe Avenue, Suite 100 S Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No