Owens Dry Lake Phase 8 Dust Control Measurement Project

4 Documents in Project

Summary

SCH Number
2010071044
Lead Agency
City of Los Angeles
Document Title
Owens Dry Lake Phase 8 Dust Control Measurement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2010
Present Land Use
OS-40 (Open Space, 40-acre lot minimum)
Document Description
As a means of controlling excessive dust emissions, the Los Angeles Department of Water and Power proposes to install and maintain ~2.03 sq. miles of gravel cover at the northern end of the Owens Dry Lakebed that the Great Basin Unified Air Pollution Control District has identified as emissive. In addition to the actual installation of gravel, the project includes placement of up to 6,000 tons of road base material to expand the roadway known as Corridor 1, construction of berms, placement of permeable geotextile fabric, stockpiling of gravel during project construction, an d hauling of gravel from the source areas to the construction area by truck along the Main Line Road.

Contact Information

Name
Curtis L. Fossum
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
Sulfate Road, Main Line Road
Zip
93530
Total Acres
1300
Parcel #
026-180-09
State Highways
U.S. 395, SR 136 and etc.
Waterways
Owens River
Base
MDB&M
Other Location Info
City/Nearest Community: Lone Pine, Keeler

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print