Savings Bank of Mendocino County, Lakeport Branch

2 Documents in Project

Summary

SCH Number
2010069023
Lead Agency
City of Lakeport
Document Title
Savings Bank of Mendocino County, Lakeport Branch
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2010
Document Description
This project will construct a new 3,036 sf building on an existing dirt and paved lot, landscaping and paving for a parking lot. The area around the building and parking lot will be landscaped and a 30 ft "buffer zone" created between new building/paving and the top of the bank of Forbes Creek. Runoff from the site will be collected by downspouts and drop inlets and conveyed by underground storm drain pipes to two stabilized outfalls located in the "buffer zone" between the new construction and Forbes Creek. The runoff will then continue to be conveyed by open channel vegetated swales to a stabilized outfall along the southerly bank of Forbes Creek between the end of the existing retaining wall and the existing red willow tree. Approximately 14 linear ft of the south bank of Forbes Creek will be regraded to a maximum depth of 2 ft from the existing top of bank to construct a trapezoidal shaped vegetated swale outfall to convey runoff. Excavation will occur between the retaining wall and the red willow and will not impact the willow roots. Excavation volume on the bank of Forbes Creek is ~56 cy. No equipment will work in the water.

Contact Information

Name
Kelley Barker
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Lakeport
Counties
Lake

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print