Savings Bank of Mendocino County, Lakeport Branch

2 Documents in Project

Summary

SCH Number
2010069023
Lead Agency
Lakeport, City of (City of Lakeport)
Document Title
Savings Bank of Mendocino County, Lakeport Branch
Document Type
NOD - Notice of Determination
Received

Document Description
This project will construct a new 3,036 sf building on an existing dirt and paved lot, landscaping and paving for a parking lot. The area around the building and parking lot will be landscaped and a 30 ft "buffer zone" created between new building/paving and the top of the bank of Forbes Creek. Runoff from the site will be collected by downspouts and drop inlets and conveyed by underground storm drain pipes to two stabilized outfalls located in the "buffer zone" between the new construction and Forbes Creek. The runoff will then continue to be conveyed by open channel vegetated swales to a stabilized outfall along the southerly bank of Forbes Creek between the end of the existing retaining wall and the existing red willow tree. Approximately 14 linear ft of the south bank of Forbes Creek will be regraded to a maximum depth of 2 ft from the existing top of bank to construct a trapezoidal shaped vegetated swale outfall to convey runoff. Excavation will occur between the retaining wall and the red willow and will not impact the willow roots. Excavation volume on the bank of Forbes Creek is ~56 cy. No equipment will work in the water.

Contact Information
Kelley Barker
Department of Fish and Game
North Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

916-358-4353

Location

Cities
Lakeport
Counties
Lake

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
City of Lakeport Community Development 225 Park St Lakeport, CA 95453

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes