Engineering Geotechnical Studies for the Bay Delta Conservation and/or Preliminary Engineering Studies for the Delta Habitat Conservation and Conveyance Program

11 Documents in Project

Summary

SCH Number
2010062041
Lead Agency
California Department of Water Resources (DWR)
Document Title
Engineering Geotechnical Studies for the Bay Delta Conservation and/or Preliminary Engineering Studies for the Delta Habitat Conservation and Conveyance Program
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2012
Present Land Use
Various
Document Description
The Department of Water Resources is planning to conduct overwater and land geotechnical borings, perform cone penetration tests (CPT) and dig approximately 30 small test pit in order to test soils in the Sacramento-San Joaquin Delta. DWR will investigate the engineering properties of the soils within a narrow corridor transecting the Delta. The purpose of the investigation is to gather necessary geotechnical information to support the preparing of the draft EIR/EIS for the proposed BDCP and/or DHCCP. The CWC adopted resolutions of necessity to provide access for the Project.

Contact Information

Name
Rachel Ballanti
Agency Name
California Water Commission
Contact Types
Lead/Public Agency

Location

Cities
Isleton
Counties
Contra Costa, Sacramento, San Joaquin, Solano, Yolo
Parcel #
Various
State Highways
Hwy 4, 5, 12, 160, 220
Waterways
Various
Section
Multi
Other Location Info
City/Nearest Community: Sacramento-San Joaquin Delta

Notice of Determination

Approving Agency
California Water Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print