Wild Goose Phase 3 Gas Storage Expansion

7 Documents in Project

Summary

SCH Number
2010062025
Lead Agency
Public Utilities Commission, California (California Public Utilities Commission)
Document Title
Wild Goose Phase 3 Gas Storage Expansion
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2011
Present Land Use
Remote Facility Site: Butte County GP: Orchard and Field Crops (OFC) / Z: Agriculture 40 acre minimum parcel size (A-40) PG&E Electric Distribution Reconductoring: BCGP: OFC / Z: A-40, A-5 City of Gridley GP/Z: Residential Suburban (R-S, 3 units/acre max) Delevan Site: Colusa County GP: Agriculture (A-G) / Z: Exclusive Agriculture (E-A)

Document Description
The WG Phase 3 would result in an increase of the physical footprint and current operations at the WG facility; consist of: expansion to Remote Facility Site, modifications to the Delevan site, hot tapped connections to PG&E Lines 400 and 401, and PG&E distribution line reconductoring.

Contact Information
Eric Chiang
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102

Phone : (415) 703-1956

Location

Coordinates
39°20'53.10"N 121°49'11.63"W
Cities
Colusa Gridley
Counties
Butte Colusa
Cross Streets
West Liberty & Pennington Rds (Butte)/Noel Evan Rd & Delevan Rd (Colusa)
Zip
95948/55
Parcel #
remote facility site: 021-010-047-000
State Highways
SR 99, I-5
Railways
No
Airports
No
Schools
Sycamore MS, McKinley ES
Waterways
Feather River, Sacramento River, Lake Oroville
Township
17N
Range
1E
Section
2
Other Location Info
City/Nearest Community: Maxwell (Colusa)
Other Information
RFS: ~5 acres PG&E: ~15 acres Delevan: ~1

Notice of Determination

Approving Agency
California Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Gridley Library, 299 Spruce St, Gridley, CA 95945 and CPUC website

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print