Lower Valley Irrigation System Expansion Project

2 Documents in Project

Summary

SCH Number
2010061075
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Lower Valley Irrigation System Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
8/2/2010
Document Description
The Lower Coachella Valley Irrigation System Extension Project entails the ~2.9 mile extension of an irrigation pipeline, Lateral 97.0-4.3, from its current terminus near Avenue 65, south to Avenue 68 along Buchanan Street, and then easterly along Avenue 68 for ~4,000 lineal ft. The project involves the installation of 8,600 lineal ft of 30 inch pipe, 1,560 lineal ft of 24 inch pipe, 2,700 lineal ft of 18 inch pipe, and 2,670 lineal ft of 12 inch pipe, to serve Coachella Canal water (Colorado River water) to 4 landowners representing 753 acres of land within Improvement District No. 1 who are currently pumping groundwater. The project involves 56 lineal ft of a 48 inch bore under Avenue 66 (State Highway 195), and 263 lineal ft of 48 inch bore under State Highway 86S. All of the pipeline proposed will be made of polyvinyl chloride (PVC).

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Avenue 68/Buchanan St
Zip
92274
Total Acres
~2.0
Parcel #
various
State Highways
Hwy 86S, 111, 195
Railways
UPRR
Airports
Thermal
Schools
Desert Mirage HS, Toro Canyon MS
Waterways
Coachella Valley Stormwater Channel
Township
7S
Range
9E
Section
var
Base
SBB&M
Other Location Info
City/Nearest Community: Mecca

Notice of Determination

Approving Agency
Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print