Salton Sea Species Conservation Habitat Project (CESA MOU ID: 2081a-2019-002-R6)

28 Documents in Project

Summary

SCH Number
2010061062
Lead Agency
California Natural Resources Agency
Document Title
Salton Sea Species Conservation Habitat Project (CESA MOU ID: 2081a-2019-002-R6)
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2019
Document Description
The project consists of the construction of a series of gravity-fed ponds with islands and areas of varying water depths that will serve as fish and avian habitat, the development of associated water delivery systems, and associated electrical power infrastructure development to provide power for the water pumps. These ponds will impound saline water at a shallow depth within the project site to create piscivorous bird habitat within an area of currently exposed and dry playa area. This will be done to offset the loss of habitat of this type that is occurring as the Salton Sea recedes and becomes increasingly saline. The SCH project will involve the construction of ponds to the east and west of the New River. These ponds will cover 3,770 acres and will also be associated with water delivery and electrical power supply infrastructure.

Contact Information

Name
Arturo Delgado
Agency Name
Department of Fish and Wildlife Inland Desert Region
Contact Types
Lead/Public Agency

Location

Cities
Calipatria, Imperial
Counties
Imperial
Other Location Info
The Salton Sea Species Conservation Habitat Project is located in Imperial County towards the southern end of the Salton Sea at the mouth of the New River about 9 miles west of the City of Calipatria, Imperial County, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print