Salton Sea Species Conservation Habitat (SCH) Project (Lake or Streambed Alteration Agreement No. 1600-2016-0141-R6)

28 Documents in Project

Summary

SCH Number
2010061062
Lead Agency
The Resources Agency
Document Title
Salton Sea Species Conservation Habitat (SCH) Project (Lake or Streambed Alteration Agreement No. 1600-2016-0141-R6)
Document Type
NOD - Notice of Determination
Received
Posted
10/17/2016
Present Land Use
Salton Sea is a repository for agricultural drainage; surrounding areas are predominantly used for agriculture.
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0141-R6, pursuant to section 1602 of the Fish and Game Code to the project applicant, DWR. Project is limited to the construction of three pond units (East New, West New, and Far West New) that will impound saline water at a shallow depth within the project site, the development of associated water delivery systems, and associated electrical power infrastructure development to provide power for the water pumps. the project will restore piscivorous bird habitat within an area of currently exposed and dry playa area to offset the loss of habitat of this type that is occurring as the Salton Sea recedes and concurrently increases in salinity.

Contact Information

Name
Charles Land
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Calipatria, Westmorland
Counties
Imperial
Zip
Multiple
Total Acres
3770
Parcel #
Multiple
State Highways
Hwy 86 & 111
Railways
Union Pacific
Airports
No
Waterways
New River, Alamo River
Township
Multip
Range
Multip
Section
Multip
Base
Multiple

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print