Heraeus Metal Processing, LLC.

4 Documents in Project

Summary

SCH Number
2010061001
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Heraeus Metal Processing, LLC.
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2011
Present Land Use
M-2 Industrial Use
Document Description
Heraeus Metal Processing, LLC. (Facility) is a precious metal recycling facility that recovers and refines precious metals including gold, silver, platinum, palladium, and rhodium. Precious metals are recovered from materials such as ores and concentrates, industrial catalysts, ceramics, off specification bullion and solutions, and scrap precious metals and alloys. Recovered metals are further refined to their pure states for formation into precious metal compounds, or they are fabricated into various shapes and sizes for industrial uses. The Facility extracts the precious metal from scrap materials by storing and cleaning the precious metal extracts in a series of tanks. The Facility is undergoing a permit renewal. No construction is happening on site and there are no changes in operation.

Contact Information

Name
Joanna Louie
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Santa Fe Springs
Counties
Los Angeles
Cross Streets
Carmenita Road and Alondra Blvd
Zip
90670
Total Acres
7.32
Parcel #
7005-014-034, 066, 065, 063, 064, 062, 35, 36, 67, 070
State Highways
I-5, HWY 91
Railways
UPRR
Airports
No
Schools
Carmenita MS
Waterways
No
Township
3
Range
11
Section
21

Notice of Determination

Approving Agency
California Environmental Quality Act
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print