Streambed Alteration Agreement 1600-2010-0095-3/THP #1-08-090 SON

Summary

SCH Number
2010059014
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement 1600-2010-0095-3/THP #1-08-090 SON
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2010
Document Description
The Applicant proposes to replace and enhance existing crossings and install temporary crossings on Class ll streams within the timber harvest boundary located in Township 10 North, Range 14 West, German Rancho Section of the 7.5 minute USGS Stewart's Point Quad; Mt. Diablo Base Meridian. The project is limited to the following: replacing culverts at road point 4 and 5; installing a temporary crossing on skid trail crossings at road points 50 and 60; install a temporary crossing on a seasonal road at road points 81 and 87; shape the seasonal road and install a ditch that allows water to sheet flow toward the Class ll watercourse; and installation of rolling dips on the seasonal road to allow the water to be diverted back into the stream at road points 76, 77, and 84. For all temporary crossings, at the end of timber operations, the stream channels will be returned to the natural stream grade and banks will be pulled to stable repose. The California Department of Fish and Game (DFG) is executing a Lake and Streambed Alteration Agreement 1600-2010-0095-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Gualala Redwoods, Inc.

Contact Information

Name
Stepahnie Buss
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Napa

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print