QCSD Wastewater Treatment Discharge Project
Summary
- SCH Number
- 2010059013
- Lead Agency
- Quincy Community Services District
- Document Title
- QCSD Wastewater Treatment Discharge Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/19/2010
- Document Description
- Creation of a new treated effluent discharge channel from the area waste water treatment plant to adjacent Spanish Creek. Placement of mixing bars within Spanish Creek. Placement of armoring and scour basins within the effluent discharge channel to control flows and slow down-cutting of the channel. Additionally, sections of Clear Stream that are actively down-cutting will be rocked. The new discharge channel will result in excavation of ~0.1 acres (1200 linear ft) of the riparian zone associated with Spanish Creek. Construction in Clear stream is proposed for late summer when flows are not present. Water present in Spanish Creek during final construction and joining of the discharge channel with Spanish Creek will be diverted around the construction site. Appropriate native riparian vegetation will be planted in and along the armoring to help stabilize the banks of Clear Stream and the diversion Channel.
- Contact Information
-
Robert C. Hosea
Department of Fish and Game
Lead/Public Agency
Sacramento Valley and Sierra Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670
Phone : (916) 704-9156
Location
- Counties
- Plumas
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Quincy Community Services District 900 Spanish Creek Rd Quincy, CA 95971
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.