Streambed Alteration Agreement 1600-2009-0312-3/THP # 1-07-093 SCR Maj Am 6

Summary

SCH Number
2010059002
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement 1600-2009-0312-3/THP # 1-07-093 SCR Maj Am 6
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2010

Document Description
The Applicant proposes 1) the construction of a permanent bridge over Soquel Creek using 89-foot railcar beams, 2) the installation of two temporary bridge crossings over Soquel Creek, and 3) the shaping and placement of rock on the approaches to three low-flow crossings along Hinckley Creek. Hinckley Creek flows into Soquel Creek which empties into the Pacific Ocean. The THP area is located approximately 4 miles north of the town of Soquel in Township 10 South, Range 1 West, Sections 13, 14 and 24 of the Laurel 7.5 Minute USGS Quadrangle; Mt. Diablo Meridian. The California Department of Fish and Game (DFG) is executing a Lake and Streambed Alteration Agreement 1600-2009-0312-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, David Van Lennep/Redwood Empire Sawmills.

Contact Information
Terris Kastner
California Department of Fish and Game
Lead/Public Agency
P.O. Box 47
Yountville, CA 94559

Phone : (408) 365-1066

Location

Cities
Santa Rosa
Counties
Santa Cruz

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California Department of Forestry and Fire Protection 135 Ridgway Ave Santa Rosa, CA 95402

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.