Millennial Tech Middle School Modernization Project

Summary

SCH Number
2010058271
Public Agency
San Diego Unified School District
Document Title
Millennial Tech Middle School Modernization Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/28/2010
Document Description
The San Diego Unified School District proposes the following components that would occur within the existing Millennial Tech Middle School campus: * Construction of a new two-story 12 classroom building within the existing school campus boundary, to replace the existing 11 relocatable classroom buildings currently located on the school campus; * The 11 relocatable classroom buildings would be temporarily relocated to the athletic field area until construction of the new two-story 12 classroom building is complete; * Construction of a new bus pick-up and drop-off on-site located adjacent to the east side of the athletic field area on the existing school campus.

Contact Information

Name
James H. Watts
Agency Name
San Diego Unified School District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302c, 15314
Reasons for Exemption
The proposed project will be located on the existing middle school campus; The proposed two-story classroom building will replace the existing relocatable classroom building and will have substantially the same purpose and capacity.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print