Pearson Property Gully Stabilization Project

2 Documents in Project

Summary

SCH Number
2010052054
Lead Agency
Santa Cruz County
Document Title
Pearson Property Gully Stabilization Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed activities include the repair and stabilization of an eroded gully that originates at a culvert on Benedict Avenue and extends downstream for ~535 linear ft. The proposed project will allow surface flows, up to the 10 yr storm event, to flow within a new channel for ~220 linear ft. Flow within the new channel will be regulated by 4 gabion check dams. Storm flows in excess of the 10 yr event will be directed into an underground drainage pipe that will extend from the inlet culvert downstream ~500 linear ft and daylight at a new rock-lined energy dissipater. Other project features include new hillside concrete-lined swales/V-ditches to collect surface runoff and direct flows to a series of drainage pipe inlets.

Contact Information
Suzanne DeLeon
California Department of Fish and Game
Central Coast Region P.O. Box 47
Yountville, CA 94599

831-440-9433

Location

Coordinates
37°00'06"N 121°58'38"W
Counties
Santa Cruz
Cross Streets
Benedict Ave and Cabrillo Ave
Zip
95065
Total Acres
countywide
Parcel #
102-121-33, 34, 37, 70
State Highways
Hwy 1
Railways
No
Airports
No
Schools
Santa Cruz Gardens ES, Soquel High
Waterways
Arana Gulch, Soquel Creek, Rodeo Creek Gulch, Branciforte Creek
Township
11S
Range
1W
Section
4
Base
MDB&M
Other Location Info
City/Nearest Community: Live Oak

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Santa Cruz County 701 Ocean St Santa Cruz, CA 95060

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A