Dunsmuir Wastewater Collection and Treatment Improvement Plan

4 Documents in Project

Summary

SCH Number
2010052049
Lead Agency
City of Dunsmuir
Document Title
Dunsmuir Wastewater Collection and Treatment Improvement Plan
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2010
Document Description
The proposed project consists of replacement of sewer mains and laterals within existing paved roadways and improvements to the City's existing wastewater treatment plant to meet the requirements for waste discharge as set by the Regional Water Quality Control Board. The project is intended to serve the existing and planned needs of the City for municipal wastewater needs. The proposed project includes the replacement of ~2,500 linear ft of 6 inch to 10 inch sewer pipe. The WWTP is located on City-owned property within the unincorporated area of Shasta County. The project is intended to serve the existing and planned needs of the City for municipal wastewater needs. The proposed project includes the replacement of ~2,500 linear ft of 6 inch to 10 inch sewer pipe.

Contact Information

Name
Jim Lindley
Agency Name
City of Dunsmuir
Contact Types
Lead/Public Agency

Location

Cities
Mount Shasta
Counties
Siskiyou
Cross Streets
WWTP-South 2st Street, distribution system - various streets throughout the city
Zip
96025
Total Acres
2,500 LF
Parcel #
Various
State Highways
I-5
Railways
UPRR
Airports
Mott
Waterways
Sacramento River
Township
38-40N
Range
3, 4W
Section
many
Base
USGS
Other Location Info
City/Nearest Community: Castella

Notice of Determination

Approving Agency
City of Dunsmuir
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print