Bowen-Jonas Minor Subdivision; TPM 21027

2 Documents in Project

Summary

SCH Number
2010051095
Lead Agency
San Diego County
Document Title
Bowen-Jonas Minor Subdivision; TPM 21027
Document Type
NOD - Notice of Determination
Received

Document Description
The project is a Tentative Parcel Map to subdivide 80 acres into 4 residential lots ranging from 8.3 to 8.9 acres, with a 44.2 acre remainder lot. The project site is located on Borrego Springs Road (south of Country Club Road) in the Desert Subregional Pan, within unincorporated San Diego County. The site is subject to the General Plan Regional Category "Rural Development Area," Land Use Designation Multiple Rural Use (18). Zoning for the site is Rural Residential (.25 du/ac). The site is undeveloped. Access would be provided by private roads connecting to: Borrego Springs Road (a Circulation Element Road) and Country Club Road. The project would be served by on-site septic systems and water from the Borrego Water District, which is obtained from groundwater resources. Approximately 1,000 ft extension of water utilities will be required by the project. Earthwork will consist of cut and fill of 200 cy of material.

Contact Information
Kristina Jeffers
San Diego County
5201 Ruffin Road, Suite B
San Diego, CA 92123

858-694-2604

Location

Coordinates
33°13'7"N 116°22'33"W
Counties
San Diego
Cross Streets
Country Club Rd/Borrego Springs Rd
Zip
92004
Total Acres
80
Parcel #
198-320-03-00
Township
11S
Range
6E
Section
17
Base
SBB&M
Other Location Info
City/Nearest Community: Borrego Springs

Notice of Determination

Approving Agency
County of San Diego Planning and Land Use
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
County of San Diego 5201 Ruffin Road, Suite B San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search