Second Addendum to the Uptown Newport EIR
5 Documents in Project
Summary
SCH Number
2010051094
Lead Agency
City of Newport Beach
Document Title
Second Addendum to the Uptown Newport EIR
Document Type
NOD - Notice of Determination
Received
Posted
7/30/2020
Document Description
second addendum to the certified Uptown Newport EIR to change a mitigation measure related to hazardous materials. Instead of relocating an existing anhydrous ammonia tank to a location 200 feet from residential buildings, as currently required by Mitigation Measure No. 7-2, the applicant proposed to enclose the existing anhydrous ammonia tank in its current location with additional safety features to protect future residents. Two additional non-substantive changes were included to clarify Mitigation Measures 7-3 and 7-4. An addendum to the previously certified Environmental Impact Report (EIR) for the Uptown Newport project has been approved that evaluated the changes to the mitigation measures.
Contact Information
Name
Liz Westmoreland
Agency Name
City of Newport Beach Planning Division
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
TSG-Parcel 1, LLC.
Contact Types
Project Applicant
Location
Cities
Newport Beach
Counties
Orange
Other Location Info
4311-4321 Jamboree Road
Notice of Determination
Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.