Second Addendum to the Uptown Newport EIR
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010051094
- Lead Agency
- Newport Beach, City of (City of Newport Beach)
- Document Title
- Second Addendum to the Uptown Newport EIR
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/30/2020
- Project Applicant
- TSG-Parcel 1, LLC.
- Document Description
- second addendum to the certified Uptown Newport EIR to change a mitigation measure related to hazardous materials. Instead of relocating an existing anhydrous ammonia tank to a location 200 feet from residential buildings, as currently required by Mitigation Measure No. 7-2, the applicant proposed to enclose the existing anhydrous ammonia tank in its current location with additional safety features to protect future residents. Two additional non-substantive changes were included to clarify Mitigation Measures 7-3 and 7-4. An addendum to the previously certified Environmental Impact Report (EIR) for the Uptown Newport project has been approved that evaluated the changes to the mitigation measures.
- Contact Information
-
Liz Westmoreland
City of Newport Beach Planning Division
100 Civic Center Drive P.O. Box 1768
Newport Beach, CA 92658-8915
Phone : (949) 644-3200
Location
- Cities
- Newport Beach
- Counties
- Orange
- Other Location Info
- 4311-4321 Jamboree Road
Notice of Determination
- Approving Agency
- City of Newport Beach
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 100 Civic Center Drive. Newport Beach. CA 92658-8915
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Attachments
- Notice of Determination
- 2010051094_Uptown Newport Addendum 2 PDF 76 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.