Hesperie Subregional Wastewater Reclamation Plant (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4807-110

7 Documents in Project

Summary

SCH Number
2010051087
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Hesperie Subregional Wastewater Reclamation Plant (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4807-110
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2014

Document Description
The Project will consist of constructing the Hesperia Sub regional WRP with a mechanical 1.0 Million gallon per day treatment capacity, constructing percolation ponds, constructing a new Hesperia Raw Sewage lift station surrounded by a 6-foot high block wall, constructing approximately 730 feet of 18-inch gravity interceptor pipeline from the new Hesperia Raw Sewage lift station to the connection with an existing 12-inch sanitary sewer pipeline, constructing approximately 2,265 feet of 12-inch force main from the Hesperia Raw Sewage lift station to the Hesperia WRP, and constructing a recycled water pump station.

Contact Information
Christine Day
State Water Resources Control Board
Division of Financial Assistance 1001 I Street 16th Floor
Sacramento, CA 95814

Phone : (916) 319-9440

Location

Coordinates
34°28'15"N 117°15'25"W
Cities
Apple Valley Hesperia
Counties
San Bernardino
Cross Streets
Bear Valley Road / Hesperia Road / I-15
Zip
92345
Total Acres
~60
State Highways
I-15
Railways
BNSF
Airports
Apple Valley Airport
Schools
several
Waterways
Mojave River
Township
4-6N
Range
3,4W
Section
many
Base
SBB&M

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
State Water Resources Control Board Division of Financial Assistance 1001 I Street 16th Floor, Sacramento CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes