Town of Apple Valley Wastewater Reclamation Plant, City of Hesperia Wastewater Reclamation Plant, and Related

7 Documents in Project

Summary

SCH Number
2010051087
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Town of Apple Valley Wastewater Reclamation Plant, City of Hesperia Wastewater Reclamation Plant, and Related
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2011
Document Description
The proposed project consists of the consists of the construction and installation of the following components: 1.0 MGD average flow Water Reclamation Plant in the Town of Apple Valley expandable to a 4.0 MGD Plant; a 1.0 MGD average flow Water Reclamation Plant in the City of Hesperia expandable to a 4.0 MGD Plant (the expansion would occur in the future when demand justifies such expansion at both WRPs); a lift station and force main to serve the proposed Hesperia WRP; modification of a lift station to serve the proposed Apple Valley WRP; and recycled water distribution infrastructure and disposal percolation ponds to serve each WRP. The wastewater will be treated to meet highly Title 22 recycled water requirements and will be used for industrial and landscape irrigation with excess recycled water disposed of in percolation ponds.

Contact Information

Name
Logan Olds
Agency Name
Victor Valley Wastewater Reclamation Authority
Contact Types
Lead/Public Agency

Location

Cities
Apple Valley, Hesperia
Counties
San Bernardino
Cross Streets
Bear Valley Road / Hesperia Road / I-15
Zip
92345
Total Acres
~60
State Highways
I-15
Railways
BNSF
Airports
Apple Valley Airport
Schools
several
Waterways
Mojave River
Township
4-6N
Range
3,4W
Section
many
Base
SBB&M

Notice of Determination

Approving Agency
Victor Valley Wastewater Reclamation Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print