Operation of Golden State Water Company - San Dimas (GSWC) Brasada-Tank Project (Project)

7 Documents in Project

Summary

SCH Number
2010051020
Lead Agency
City of San Dimas
Document Title
Operation of Golden State Water Company - San Dimas (GSWC) Brasada-Tank Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2019
Document Description
The GSWC proposed Project included that water to the Project site would be supplied by a proposed eight-inch on-site mainline connecting to an existing water supply line south of the Project site beneath Cataract Avenue. A water tank approximately 610,000-gallons in size would be located on an approximately three-acre lot in the north central area of the Project site. The tank would provide storage for use within the Project site and water supply for emergency fire service. The tank would be positioned at an elevation that is approximately 100 feet above the highest residential lot and would be designed to gravity feed water for residential and fire uses. The tank would be situated on an approximately 73-foot diameter concrete ring foundation and would have an inside diameter of approximately 72 feet. The tank would rise approximately 24 feet above the concrete foundation. A water pump would be located north of the Project's entry gate, which would augment water pressure and conveyance throughout the Project site.

Contact Information

Name
Dmitry Ginzburg
Agency Name
State Water Resources Control Board (State Water Board)
Contact Types
Lead/Public Agency

Location

Cities
San Dimas
Counties
Los Angeles

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print