Mid-Coast Corridor Transit Project

13 Documents in Project

Summary

SCH Number
2010051001
Lead Agency
San Diego Association of Governments
Document Title
Mid-Coast Corridor Transit Project
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2018
Present Land Use
Generally the project would be located within or adjacent to transportation rights-of-way (i.e., railroad, I-5, and street)
Document Description
Project will extend the San Diego Trolley Blue Line from the Santa Fe Depot in Downtown San Diego north to the Old Town Transit Centre (UTC) Transit Center in University City. Nine new stations (four at grade and five aerial), would be built at the following locations: Tecolote Road, Clairemont Dr., Balboa Ave., Nobel Dr., Veterans Administration Medical Center, University of CA San Diego West Campus (now referred to as Pepper Canyon), USCD East Campus (now referred to as Voigt Dr.), Executive Dr., and the UTC Transit Center. With this extension the project would provide for continuous service on the Trolley Blue Line from the San Ysidro Transit Center at the U.S.-Mexico international border to University City. In addition to the 11 miles of new Trolley tracks and nine new stations, the project includes upgrades to existing facilities between the Santa Fe Depot and the OTTC, and the acquisition of new Trolley vehicles for the extended project operation. The project alignment would be located primarily within existing Metropolitan Transit System, City of San Diego, or Caltrans right-of-way; along local streets; and within the Los Angeles-San Diego-San Luis Obispo Rail Corridor Agency and I-5 corridors.

Contact Information

Name
Keith Greer
Agency Name
San Diego Association of Governments
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Generally along I-5 corridor between Downtown San Diego and University City
Zip
Various
Parcel #
Various
State Highways
SR 52; I-5, I-8, I-805
Railways
BNSF
Airports
San Diego
Schools
UCSD
Waterways
Pacific Ocean, San Diego River, Rose Creeks & Tecolote Creek

Notice of Determination

Approving Agency
San Diego Association of Governments
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print