Mid-Coast Corridor Transit Project

13 Documents in Project

Summary

SCH Number
2010051001
Lead Agency
San Diego Association of Governments
Document Title
Mid-Coast Corridor Transit Project
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2020
Document Description
The Mid-Coast Corridor Transit Project will extend the San Diego Trolley Blue Line from the Santa Fe Depot in Downtown San Diego north to the Old Town Transit Center (OTTC) via the existing Trolley tracks. New tracks would then extend north for 11 miles to the University Towne Centre (UTC) Transit Center in University City. Nine new stations (four at grade and five aerial) would be built at the following locations: Tecolote Road, Clairemont Drive, Balboa Avenue, Nobel Drive, Veterans Administration Medical Center, University of California San Diego (USCD) West Campus (now referred to as Pepper Canyon), USCD East Campus (now referred to as Voigt Drive), Executive Drive, and the UTC Transit Center. With this extension, the project would provide for continuous service on the Trolley Blue Line from the San Ysidro Transit Center at the U.S.- Mexico international border to University City. In addition to the 11 miles of new Trolley tracks and nine new stations, the project includes upgrades to existing facilities between the Santa Fe Depot and the OTTC, and the acquisition of new Trolley vehicles for the extended project operation. The project alignment would be located primarily within existing Metropolitan Transit System, City of San Diego, or California Department of Transportation right-of-way; along local streets; and within the Los Angeles-San Diego-San Luis Obispo Rail Corridor Agency and Interstate 5 corridors.

Contact Information

Name
Keith Greer
Agency Name
San Diego Association of Governments
Contact Types
Lead/Public Agency

Name
Agency Name
San Diego Association of Governments
Contact Types
Project Applicant

Location

Cities
San Diego
Counties
San Diego

Notice of Determination

Approving Agency
San Diego Association of Governments
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print