Meadow Valley Timber Harvesting Plan

Summary

SCH Number
2010049010
Lead Agency
Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
Document Title
Meadow Valley Timber Harvesting Plan
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2010

Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0019-R2, pursuant to Section 1602/1611 of the Fish and Game Code to the project applicant, Soper-Wheeler Company LLC. The project is limited to the "geo-technical" field evaluation to determine the specific construction details of 1 multi-plate open bottomed arch culvert on a Class 1 watercourse (Crossing A), but not the actual crossing itself until such specific construction details are amended into this Agreement; the installation of 1 temporary corrugated metal pipe (CMP) crossing of a Class 1 watercourse (Crossing B); the installation of a temporary bridge crossing of a Class 1 watercourse (Crossing F); and the installation of a permanent rocked ford crossing of a Class ll watercourse (Crossing G). The preceding references to crossing and waterholes are as depicted on the "Meadow Valley THP maps: "DFG 1603 Location Map #1" and "DFG 1603 Location Map #2". Schematics of the crossings are found in Exhibit A of the Agreement.

Contact Information
David Richter
California Department of Fish and Game
North Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

Phone : (530) 695-3199

Location

Counties
Plumas

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California Department of Forestry and Fire Protection 6105 Airport Road Redding, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.