Feasibility Study for TOC Reduction
2 Documents in Project
Summary
SCH Number
2010048309
Public Agency
City of Huron
Document Title
Feasibility Study for TOC Reduction
Document Type
NOE - Notice of Exemption
Received
Posted
4/28/2010
Document Description
The City of Huron received a Compliance Order from CDPH on July 6, 2007 for non-compliance of disinfection by-product (DPB) pre-cursor treatment technique requirements. While the design for a Chloramination facility was 95% complete in June 2009, CDPH had ran additional tests that showed the DPB's were higher than previously tested and would require additional treatment to meet the discharge requirements.
Contact Information
Name
Stephanie Tadlock
Agency Name
City of Huron
Contact Types
Lead/Public Agency
Phone
Location
Cities
Huron
Counties
Fresno
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15306
Reasons for Exemption
This project consists only of information collection and planning study uses (with minimal ground breaking disturbances that will not impact any of the environmental surroundings) and is exempt per CCR Title 15, Article 19, Section 15306 (Class 6) as well as Article 18, Section 15262. The study is for improvements related to a water system with less than 1000 connections (only 1 connection).
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.