Tier 2 - Planning Study that will include test wells for Water Quality Upgrade
3 Documents in Project
Summary
SCH Number
2010048017
Public Agency
Rand Communities Water District
Document Title
Tier 2 - Planning Study that will include test wells for Water Quality Upgrade
Document Type
NOE - Notice of Exemption
Received
Posted
4/1/2010
Document Description
The purpose of this planning study is to investigate the feasibility of drilling wells that meet the arsenic MCI and, if necessary, determine the mose beneficial method of arsenic treatment. The intent of the plannning is to prepare the necessary engineering design elements and drill test wells such thet RCWD will be ready to resubmit a SRF Construction Loan Application that can be considered "shovel ready." The planning scope will also include hydrogeological investigation, surveying, plans and specifications, environmentatl documentation, and application for consruction funds.
Contact Information
Name
Tom Treat
Agency Name
Rand Communities Water District
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Kern, San Bernardino
Other Location Info
Randsburg
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
15262; 15306 - Class 6
Reasons for Exemption
The project is intended to evaluate water quality improvement alternatives, completion of engineering report, preparation of plans and specifications, surveying, and an environmental document.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.