Revised Solid Waste Facility Permit for San Onofre Landfill, SWIS # 37-AA-0902
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010044005
- Lead Agency
- United States Marine Corp
- Document Title
- Revised Solid Waste Facility Permit for San Onofre Landfill, SWIS # 37-AA-0902
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/11/2011
- Document Description
- The following changes are proposed to the existing facility known as Las Pulgas Landfill: an increase in maximum daily tonnage from 270 tons to 400 tons; an increase in maximum daily traffic violume from 37 vehicles per day to 80 vehicles per day; increase in permitted site from 88.7 acres to 133 acres (no change in the waste footprint); change in the estimated closure date form November 2184 to March 31, 2047; an update in daily cover stating that the operator may utilizw daily cover as outlined in the most current JTD; updates to the Local Enforcement Agency findings and conditions; updates to the Joint Technical Document and updates to other related documents and references.
- Contact Information
-
Megan E. Fisher
CalRecycle
Lead/Public Agency
P.O. Box 4025
Sacramento, CA 95812-4025
Phone : (951) 782-4184
Location
- Counties
- San Diego
- Zip
- 92055
- Other Location Info
- City/Nearest Community: Camp Pendleton
Notice of Determination
- Approving Agency
- CalRecycle
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.