Water Supply Desalination Infrastructure, Brine Pipeline Project, Eastern Municipal Water District (EMWD)
4 Documents in Project
Summary
SCH Number
2010044001
Lead Agency
United States Army, Army Corps of Engineers
(USACE)
Document Title
Water Supply Desalination Infrastructure, Brine Pipeline Project, Eastern Municipal Water District (EMWD)
Document Type
NOD - Notice of Determination
Received
Posted
2/23/2011
Present Land Use
Public General Plan (GP) Designation
Document Description
NOTES: FINAL
In January 2005, Eastern Municipal Water District (EMWD) approved and authorized California Environmental Quality Act (CEQA) certification of the Phase I, Regional Brine Pipeline Project. A Notice of Determination was filed on January 24, 2005 and the California Department of Fish and Game Filing Fee was paid. At that time, the project consisted of approximately 19,800 lineal feet of brine conveyance pipeline that would extend from the future Perris II Desalter to an existing brine pipeline at the Menifee Desalter Plant.
Since that time, the proposed Phase I Regional Brine Pipeline (now identified as the Water Supply Desalination Infrastructure, Brine Pipeline Project) has been reduced to approximately 9,509 lineal feet, and realigned to extend from the future Perris II Desalter to tie into the existing brine line at the intersection of Hull Street and McLaughlin Road. The United States Army Corps of Engineers (USACOE), Los Angeles District is assisting EMWD and thus the project is now subject to both the California environmental Quality Act and the national Environmental policy Act (NEPA). Accordingly, the USACOE has complete preparation of the NEPA Final Environmental Assessment/finding of No Significant Impact for the brine pipeline project. The USACOE has determined that impacts resulting from the Water Supply Desalination Infrastructure, Brine Pipeline Project will not have a significant adverse effect upon the existing environmental or the quality of human environment and that the project is in compliance with both NEPA and CEQA.
Contact Information
Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Perris
Counties
Riverside
Cross Streets
McLaughlin Rd; Ethanac Rd; Green Valley Parkway; Watson Road and Hull Road
Zip
92572
Total Acres
3 and 1/4
State Highways
I-215; SR-74
Airports
no
Schools
no
Waterways
no
Township
5S
Range
3
Section
9, 15
Notice of Determination
Approving Agency
Eastern Municipal Water District
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.