Colusa Shooting Club Replacement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010042017
- Lead Agency
- Colusa County
- Document Title
- Colusa Shooting Club Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/13/2010
- Document Description
- This project will replace the existing 1457 sf clubhouse that floats on Butte Creek with a 5445 sf clubhouse built adjacent to Butte Creek and elevated above flood elevation. The building will be steel on a steel and concrete superstructure and elevated 20 ft above ground level. To support the larger building, a new AdvanTex brand Onsite Waste Water Disposal System will be installed. This AdvanTex System will replace the existing small septic tank and 3 leach lines, which will be dug up and removed. The new leach field will be a minimum of 100 ft from the edge of Butte Creek. The floating clubhouse shall be removed from Butte Creek, but existing permanent structures (concrete steps, etc) on the bank of Butte Creek shall remain in place. Equipment and machinery will enter and exit the project area via Laux Road and no trees or riparian vegetation shall be removed.
- Contact Information
-
Kelley Barker
Department of Fish and Game
North Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670
Phone : (916) 358-4353
Location
- Coordinates
- 39°11'0"N 121°56'0"W
- Cities
- Colusa
- Counties
- Colusa
- Cross Streets
- end of Laux Rd
- Total Acres
- 13.35
- Parcel #
- 015-100-008
- Waterways
- Butte Creek, Sacramento River
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Colusa County Planning Dept 220 12 St Colusa, CA 95932
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.