Malech Road Water Supply Project

2 Documents in Project

Summary

SCH Number
2010042002
Lead Agency
Santa Clara County
Document Title
Malech Road Water Supply Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project includes installation of a water pipeline, pump and associated appurtenances to supple domestic and fire water to the Mariposa Lodge Alcohol Treatment Facility, the House on the Hill, and the Sheriff's Firing Range. Roadway improvements to the Sheriff's Firing Range would also be part of the project. The physical improvements associated with the proposed project include a new booster pump station, which would be set on a concrete pad within an enclosed prefabricated enclosure surrounded by a fence. Other improvements include the installation of several PG&G power poles to provide electricity to the pump station, a new 12 inch water line from the pump station to the Sheriff's Firing Range, a new 12-inch water (trenched) along Malech Road connecting the pump station to the existing Great Oaks Water Company main located at Basking Ridge Road, 6 additional fire hydrants throughout the project site, and the widening of a portion of the existing roadway to comply with the Fire Marshalls 20 ft minimum width fire lane requirement.

Contact Information
Jim Ikeda
Santa Clara County Facilities and Fleet, Building Operations
2310 North 1st Street, 2nd Floor
San Jose, CA 95131

408-993-4600

Location

Coordinates
37°13'32"N 121°44'"W
Cities
San Jose
Counties
Santa Clara
Cross Streets
Malech Rd and US Hwy 101
Zip
95119
Total Acres
18.6
Parcel #
729-57-002
State Highways
101
Railways
No
Airports
No
Schools
No
Waterways
Coyote Creek

Notice of Determination

Approving Agency
Santa Clara County Facilities and Fleet
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Santa Clara County Facilities and Fleet 2310 North 1st Street. 2nd Floor San Jose, CA 95131

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search