City of Parlier Water Storage Tank Project

2 Documents in Project

Summary

SCH Number
2010041104
Lead Agency
City of Parlier
Document Title
City of Parlier Water Storage Tank Project
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2011
Present Land Use
M-1 (Light Industrial)
Document Description
The proposed project consists of the construction of a storage tank at ground level and the installation of booster pumps to deliver the water, along the associated piping and controls. The steel tank would be 85 feet in diameter with a capacity of 1.2 million gallons. The height of the structure including the roof will be 47 feet. The project is located in the City of Palier in Fresno County, within Section 26, Township 15 South, Range 22 East, M.D.B. & M. It occupies a portion of APN 358-390-53, adjacent to Well 9A. The project also includes a lot line adjustment to increase the site footprint to 110' x 150' (16,500 sq. ft.), as well as modification of an existing ponding basin to provide a low-flow sump area requested by the Consolidated Mosquito Abatement District.

Contact Information

Name
Bruce O'Neal
Agency Name
City of Parlier
Contact Types
Lead/Public Agency

Location

Cities
Parlier
Counties
Fresno
Cross Streets
South Mendocino Ave and East Industrial Dr
Zip
93648
Total Acres
16,600 sf
Parcel #
358-390-53
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
No
Township
15S
Range
22E
Section
26
Base
MDB&M

Notice of Determination

Approving Agency
City of Palier
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print