Alberhill System Project
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010041031
- Lead Agency
- California Public Utilities Commission (CPUC)
- Document Title
- Alberhill System Project
- Document Type
- FIN - Final Document
- Received
- Present Land Use
- open space, habitat conservation area, commercial mu, general commercial, MDR, HDR, LI, buesiness professional, floodway, P/IL-DR, L-MR, PI
- Document Description
- Note: Final EIR Errata #1 The proposed project would serve the cities of Lake Elsinore, Canyon Lake, Perris, Menifee, Murrieta, Hot Springs, Temecula, and Wildomar as well as surrounding unincorporated areas of Riverside County. The primary components of the proposed project would include: Construction of a new 1,120 MVA 500/115 kV substation (Alberhill Substation), which would be expandable to a max of 1,680 MVA depending on future need; Construction of two new 500 kV transmission lines (approximately 3.3 miles, combined) within a new ROW to connect the proposed Alberhill Substation to the existing Serrano-Valley 500 kV transmission line; Construction of approximately 11.75 kV transmission lines within primarily in the existing ROW; Construction of about 3 miles of single-circuit 115 kV subtransmission lines with distribution lines within the existing ROW; Installation of a second 115 kV circuit on approximately 6.5 miles of single circuit 115 kV subtransmission lines (the single circuit lines are is to be constructed as part of the proposed Valley-Ivyglen Project); Installation of fiber optic lines overhead (9 mi) on sections of the new or modified subtransmission lines and underground (1 mi) in proximity to the proposed Alberhill Substation and several of the existing 115/12 kV substations; Construction of an approximately 120 ft microwave antenna tower at the proposed Alberhill Substation site; installation of microwave telecommunications dish antennas at the proposed Alberhill Substation, the existing Santiago Peak Communications Site, and Serrano Substation; and other telecommunications equipment installations at existing and proposed substations; and Transfer of 5 of 14 Valley South 115 kV system substations to the proposed Alberhill 115 kV system: the Ivyglen, Fogarty, Elsinore, Skylark, and Newcomb 115/12-kV substations.
- Contact Information
-
Jensen Uchida
California Public Utilities Commission
Lead/Public Agency
505 Van Ness Avenue
San Francisco, CA 94102
Phone : (415) 703-2641
Location
- Coordinates
- 33°44'08"N 117°24'48"W
- Cities
- Lake Elsinore
- Counties
- Riverside
- Cross Streets
- Temescal canyon Road and Concordia Ranch Road
- Zip
- 92883
- Total Acres
- 34
- Parcel #
- 391-120 (002, 016, 022, 023, 026)
- State Highways
- Hwy 74, 15, 215
- Railways
- No
- Airports
- Skylark Field and Perris Valley
- Schools
- Multiple
- Waterways
- Lee Lake, Lake Elsinore, Canyon Lake
Notice of Completion
- Development Type
- Other (Substation, transmission & subtransmission lines)
- Local Action
- CPUC CPCN
- Project Issues
- Air Quality Biological Resources Cultural Resources Cumulative Effects Drainage/Absorption Economics/Jobs Flood Plain/Flooding Geology/Soils Growth Inducement Hazards & Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services Recreation Schools/Universities Septic System Solid Waste Transportation Vegetation Wetland/Riparian Wildfire
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.