Alberhill System Project
Document Type
FIN - Final Document
Received
Present Land Use
open space, habitat conservation area, commercial mu, general commercial, MDR, HDR, LI, buesiness professional, floodway, P/IL-DR, L-MR, PI
Document Description
Note: Extended Review The proposed project would serve the cities of Lake Elsinore, Canyon Lake, Perris, Menifee, Murrieta, Hot Springs, Temecula, and Wildomar as well as surrounding unincorporated areas of Riverside County. The primary components of the proposed project would include: Construction of a new 1,120 MVA 500/115 kV substation (Alberhill Substation), which would be expandable to a max of 1,680 MVA depending on future need; Construction of two new 500 kV transmission lines (approximately 3.3 miles, combined) within a new ROW to connect the proposed Alberhill Substation to the existing Serrano-Valley 500 kV transmission line; Construction of approximately 11.75 kV transmission lines within primarily in the existing ROW; Construction of about 3 miles of single-circuit 115 kV subtransmission lines with distribution lines within the existing ROW; Installation of a second 115 kV circuit on approximately 6.5 miles of single circuit 115 kV subtransmission lines (the single circuit lines are is to be constructed as part of the proposed Valley-Ivyglen Project); Installation of fiber optic lines overhead (9 mi) on sections of the new or modified subtransmission lines and underground (1 mi) in proximity to the proposed Alberhill Substation and several of the existing 115/12 kV substations; Construction of an approximately 120 ft microwave antenna tower at the proposed Alberhill Substation site; installation of microwave telecommunications dish antennas at the proposed Alberhill Substation, the existing Santiago Peak Communications Site, and Serrano Substation; and other telecommunications equipment installations at existing and proposed substations; and Transfer of 5 of 14 Valley South 115 kV system substations to the proposed Alberhill 115 kV system: the Ivyglen, Fogarty, Elsinore, Skylark, and Newcomb 115/12-kV substations.

Contact Information

Name
Jensen Uchida
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Temescal canyon Road and Concordia Ranch Road
Zip
92883
Total Acres
34
Parcel #
391-120 (002, 016, 022, 023, 026)
State Highways
Hwy 74, 15, 215
Railways
No
Airports
Skylark Field and Perris Valley
Schools
Multiple
Waterways
Lee Lake, Lake Elsinore, Canyon Lake

Notice of Completion

Development Types
Other (Substation, transmission & subtransmission lines)
Local Actions
CPUC CPCN
Project Issues
Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print