City of Paso Robles Wastewater Treatment Plant Upgrade; Agreement 2010-0143-R4

4 Documents in Project

Summary

SCH Number
2010041018
Lead Agency
City of Paso Robles
Document Title
City of Paso Robles Wastewater Treatment Plant Upgrade; Agreement 2010-0143-R4
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2010
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, City of El Paso de Robles. The applicant proposes excavating a portion of a levee separating the Salinas River from a wastewater treatment settling pond at the Paso Robles Wastewater Treatment plant and removing an outfall culvert leading to the river. A drainage channel would be sculpted into the pong to create an "effluent polishing channel" that would allow chlorine to volatize into the atmosphere before the treated water is delivered to the Salinas River. An excavator would be used to remove approximately 220 cubic yards of soil from the levee to accommodate the channel outlet, and approximately 2,000sf of Arroyo willow riparian habitat would be temporarily impacted. Several concrete blocks would be removed from the levee and disposed of off-site. Upon completion of construction, the site would be stabilized and revegetated with appropriate native species. Equipment used will include an excavator, a small finish grader, and various hand tools.

Contact Information

Name
Mike Hill
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
Sulfur Springs Rd
Zip
93446
Total Acres
69
Parcel #
08-021-006; 08-051-002, -004, -026
State Highways
Hwy 101, SR 46 E
Railways
UPRR
Airports
Paso Robles Municipal
Schools
Paso Robles SD
Waterways
Salinas River
Township
26S
Range
13E
Section
7
Base
MDB&M

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print