Jackson Avenue Channelization (Project); California Endangered Species Act Incidental Take Permit No. 2081-2011-079-04 (ITP)

5 Documents in Project

Summary

SCH Number
2010041016
Lead Agency
California Department of Transportation, District 6
Document Title
Jackson Avenue Channelization (Project); California Endangered Species Act Incidental Take Permit No. 2081-2011-079-04 (ITP)
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2012
Present Land Use
State Highway
Document Description
The Project involves constructing left-turn lanes for northbound and southbound directions on SR 41 with associated pavement widening to the east of the existing alignment from 1 to 12 feet, and realigning Jackson Avenue to meet the Advisory Standard 75 degree (minimum) intersection skew angle. The design incorporates variable widths ranging from 12 feet to 24 feet in and around the intersection to accommodate truck turning movements and 8-foot shoulders. The widening begins at PM 37.5 and ends at PM R38.1. The realignment moves Jackson Avenue approximately 45 feet (maximum) south of the existing Jackson Avenue alignment. The Project also includes relocating several utility poles and upgrading the existing safety lighting. The Project will impact 6.24 acres of Tipton kangaroo rat (Dipodomys nitratoides) habitat including temporary impacts to 4.16 acres and permanent removal of 2.08 acres of habitat. The Project is expected to result in incidental take of Tipton kangaroo rat, which is designated as an endangered species under the California Endangered Species Act. The ITP referenced above as issued by DFG authorizes incidental take of the Tipton kangaroo rat, subject to various terms and conditions, including the requirement that all authorized impacts are fully mitigated and take is minimized.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
Department of Fish and Game (DFG)
Contact Types
Lead/Public Agency

Location

Cities
Lemoore
Counties
Kings
Cross Streets
on SR 41 at Jackson Ave

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print