Remedial Action Plan for Fill Site 1, Landfill 2 and El Polin Spring

2 Documents in Project

Summary

SCH Number
2010032072
Lead Agency
Department of Toxic Substances Control
Document Title
Remedial Action Plan for Fill Site 1, Landfill 2 and El Polin Spring
Document Type
NOD - Notice of Determination
Received
Posted
6/21/2010
Document Description
The Department of Toxic Substances Control (DTSC) is approving a final Remedial Action Plan (RAP) pursuant to authority granted under Chapter 6.8, Division 20, California Helath & Safety Code (H&SC). The purposed of the RAP is to implement remedial actions for the Site that is protective of public health and safety and the environment. The Site includes three areas at teh Presidio in San Francisco that we identified as Fill Site 1 (FS1), Landfill 2 (LF2) and El Polin Spring (EPS). Soil and debris from FS1 and LF2 were contaminated with metals, pesticides, dioxins/furans and polycyclic aromatic hydrocarbons (PAHs). The selected remedial actions are soil and debris removal and offsite disposal for FS1 and LF2 and no action for EPS.

Contact Information

Name
Remedios Sunga
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Quarry Rd, El Polin Loop
Zip
94129
Total Acres
4.3
State Highways
101
Schools
Serra Pre-School, Bay School of SF, Presidio School of Mmgt.
Waterways
SF Bay
Other Location Info
Nearest Community: Presidio

Notice of Determination

Approving Agency
Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print