Remedial Action Plan for Fill Site 1, Landfill 2 and El Polin Spring

2 Documents in Project

Summary

SCH Number
2010032072
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Remedial Action Plan for Fill Site 1, Landfill 2 and El Polin Spring
Document Type
NOD - Notice of Determination
Received

Document Description
The Department of Toxic Substances Control (DTSC) is approving a final Remedial Action Plan (RAP) pursuant to authority granted under Chapter 6.8, Division 20, California Helath & Safety Code (H&SC). The purposed of the RAP is to implement remedial actions for the Site that is protective of public health and safety and the environment. The Site includes three areas at teh Presidio in San Francisco that we identified as Fill Site 1 (FS1), Landfill 2 (LF2) and El Polin Spring (EPS). Soil and debris from FS1 and LF2 were contaminated with metals, pesticides, dioxins/furans and polycyclic aromatic hydrocarbons (PAHs). The selected remedial actions are soil and debris removal and offsite disposal for FS1 and LF2 and no action for EPS.

Contact Information
Remedios Sunga
Department of Toxic Substances Control
700 Heinz Avenue
Sacramento, CA 94710

510-543-3840

Location

Coordinates
37°47'33.57"N 122°27'12.96"W
Cities
San Francisco
Counties
San Francisco
Cross Streets
Quarry Rd, El Polin Loop
Zip
94129
Total Acres
4.3
State Highways
101
Schools
Serra Pre-School, Bay School of SF, Presidio School of Mmgt.
Waterways
SF Bay
Other Location Info
Nearest Community: Presidio

Notice of Determination

Approving Agency
Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
DTSC 700 Heinz Ave Berkeley, CA 94710-2721

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
Yes