Permit No. 18050-1: Landscape Improvements to the Existing Matsui Park and Powerhouse Science Center Site
6 Documents in Project
Summary
SCH Number
2010032067
Lead Agency
City of Sacramento
Document Title
Permit No. 18050-1: Landscape Improvements to the Existing Matsui Park and Powerhouse Science Center Site
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2021
Document Description
Approval of Permit No. 18050-1, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: Landscape improvements to the existing Robert T. Matsui Waterfront Park as part of the Powerhouse Science Center project. Improvements include: concrete bicycle and pedestrian walkways, a bicycle maintenance station, open lawn spaces, seating areas, shade structures, concrete steps, an access ramp retaining wall, a donor wall, future sculpture footing, site drainage, site lighting, and a 12-inch drain with 6-inch pipe tying into an existing drainage system.
Contact Information
Name
Jennifer Stewart
Agency Name
Central Valley Flood Protection Board
Contact Types
Responsible Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located at 400 and 450 Jibboom Street, in Sacramento, California.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The Initial Study/Mitigated Negative Declaration and related documents, prepared by the lead agency for the project, are available to the general public at the lead agency’s office listed above. CVFPB’s administrative record related to the encroachment permit is available for public review at CVFPB’s office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.