White Oaks Trail Rehabilitation and Removal Project

2 Documents in Project

Summary

SCH Number
2010032057
Lead Agency
Midpeninsula Regional Open Space District
Document Title
White Oaks Trail Rehabilitation and Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
5/17/2010
Document Description
The project consists of removal of an existing steep and poorly drained 1.25 mile portion of the Whit Oaks Trail in Monte Bello Open Space Preserve and replacement with a new 0.9 mile main trail and a new 1 mile connector trail through grassland and mixed evergreen forest. The purpose of the trail rehabilitation is to correct erosion and sedimentation problems associated with the existing trail, move the trail off a disc line, and create a new trail that provides a more scenic, safe and enjoyable recreational connection between the preserve's main parking lot and trail network. The new trail design will incorporate best management practices for controlling erosion, be constructed at an average 10% gradient using small earth-moving equipment, will not cross any creeks, will not remove any large trees, and will direct traffic away from a culturally significant area. The decommissioned portion of the existing trail will be restored to natural conditions.

Contact Information

Name
Lisa Bankosh
Agency Name
Midpeninsula Regional Open Space District
Contact Types
Lead/Public Agency

Location

Cities
Palo Alto
Counties
Santa Clara
Cross Streets
Hwy 35 (Skyline Blvd) and Page Mill Rd
Zip
94020
Parcel #
35107011, 35106025
State Highways
35
Waterways
Stevens, Peters, Adobe, Corte Madera Creeks

Notice of Determination

Approving Agency
Midpeninsula Regional Open Space District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print