Manzanita to Shady Rest Connector Path (LSA 1600-2010-0071-R6)

2 Documents in Project

Summary

SCH Number
2010032044
Lead Agency
Mammoth Lakes, City of (City of Mammoth Lakes)
Document Title
Manzanita to Shady Rest Connector Path (LSA 1600-2010-0071-R6)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 (SAA# 1600-2010-0071-R6) of the Fish and Game Code to the project applicant, Town of Mammoth Lakes. The applicant proposes to install a culvert impacting an area through an ephemeral drainage approximately 20 feet by 30 feet. The culvert will be placed using a backhoe and backfilled with a composition of screened stockpile material, course sands, and crushed rock compacted to support asphalt paving. Asphalt paving will be constructed over the culvert to develop the Manzanita to Shady Rest bike path. A revegetation and monitoring plan has been prepared for the disturbed area. Construction is expected to begin in June 2010 and will take approximately 60 days to complete.

Contact Information
Ellen Clark
Dept. of Fish and Game
407 W. Line Street
Bishop, CA 93514

(760) 934-8989 x 269

Location

Coordinates
37°38'8"N 118°58'4"W
Cities
Mammoth Lakes
Counties
Mono
Cross Streets
145 Manzanita (cross street: Main)
Zip
93546
Total Acres
0.23
Parcel #
33-13-512
State Highways
203
Railways
No
Airports
No
Schools
MLKs ES, MS, HS
Waterways
No
Township
3S
Range
27E
Section
34,35
Base
NAD83

Notice of Determination

Approving Agency
California Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Town of Mammoth Lakes 437 Old Mammoth Road Suite R Mammoth Lakes, CA 93546

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search