CSC Parking Lot Expansion

2 Documents in Project

Summary

SCH Number
2010032033
Lead Agency
City of Watsonville
Document Title
CSC Parking Lot Expansion
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2010
Present Land Use
PLU: Developed with a 52,000 sf eye glass lab Z: Industrial Park (IP) GP: Industrial
Document Description
The proposed activities include construction of 0.36 acre of paved parking surface to accommodate 45 parking spaces, landscape islands, a four foot high retaining wall and associated drainage features. The drainage features include a new concrete-lined swale to collect surface runoff and direct flows to a storm drain and sub-drain pipe and then to a silt and grease trap prior to leaving the site. The project would require the removal of ~ 0.25 acres of wetlands comprised of ~0.21 acre willow thicket and a 0.04 acre of herbaceous wetland. Approximately 45 cubic yards of earth cutting and 1,085 cubic yards of fill would be required for project construction. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement, Number 1600-2010-0200-R3, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Dong K. Kim.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
Technology Dr
Zip
95076
Total Acres
.25
Parcel #
015-101-66
State Highways
1, 152
Airports
Watsonville
Schools
Rolling Hills MS
Waterways
Stuve Slough

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print